Good price  online

products details

Home > Products >
Garbage Compactor Machine
>
VerticaL 120-300T Hydraulic Marine Solid Refuse Trash Waste Refuse Garbage Compactor Plant

VerticaL 120-300T Hydraulic Marine Solid Refuse Trash Waste Refuse Garbage Compactor Plant

Brand Name: BIOCLEAN
Model Number: BCCGC-V-80-100
MOQ: 1
Price: 5000-8000 USD
Payment Terms: T/T,Western Union,MoneyGram
Supply Ability: 10000 Units per year
Detail Information
Place of Origin:
NINGBO CHINA
Certification:
SGS-CE-OWB-2022-1098
Capacity Range:
15 - 20 M³
Compaction Ratio:
3:1
Power Source:
Electric Motor
Compaction Pressure:
120 KN
Material Of Compression Ram:
Carbon Steel
Control System:
Fully Automatic Control
Packaging Details:
Custom steel frame crating
Supply Ability:
10000 Units per year
Highlight:

Hydraulic Marine Garbage Compactor Plant

,

300T Hydraulic Marine Garbage Compactor

,

Hydraulic Marine Waste Refuse Compactor Plant

Product Description

Product descriptions

120-300 TPD Vertical Waste Compaction Station – Large-Scale Cost-Efficient Hub


Designed for megacities, intercity waste transfer hubs, and large industrial clusters—especially key Belt and Road metropolises—our 120-300 TPD Vertical Waste Compaction Station combines heavy-duty vertical compression technology with economies of scale. It meets massive waste management demands with unparalleled throughput, slashing unit processing costs and optimizing long-term operational efficiency.

Core Economic & Efficient Advantages


  • Scale-Driven Savings: Split into 120-200 TPD and 200-300 TPD sub-models, serving 35,000-100,000 residents or industrial zones. Achieves 20% lower cost per ton than aggregated small-to-medium compactors via optimized energy and labor allocation.
  • Maximized Volume Reduction: Compression ratio up to 3.9:1 (waste density 1.02t/m³), cutting garbage truck trips by 70% and drastically reducing transportation, labor, and landfill fees.
  • Energy-Optimized Operation: Variable-frequency hydraulic system + load-sensing technology, consuming 18-22kW/h per cycle (15% less energy per ton than standard heavy-duty models). 8-month maintenance intervals minimize downtime and repair costs.
  • Stable Returns: 4-6 year investment payback period with predictable low operating costs, ideal for government-led projects, cross-city PPP partnerships, and waste-to-energy plant pre-processing.

Working Principle

  • Waste Loading: Dual widened inclined hoppers + optional automatic conveyors support multi-waste-stream feeding; anti-blocking agitators ensure smooth flow for bulky/high-moisture/industrial waste.
  • Vertical Compression: Four synchronous hydraulic cylinders deliver concentrated downward pressure, synergizing with gravity to form ultra-dense blocks. Load-sensing adjusts pressure by waste volume, optimizing energy use.
  • Sealed Continuous Transfer: Dual/triple alternating sealed bins eliminate downtime; full bins are hydraulically elevated, with high-speed automatic push plates completing truck transfers in 30-45 seconds.
  • Eco-Friendly Treatment: Compression sewage undergoes closed-loop treatment (filtration + pH adjustment) before discharge; triple deodorization (biological + activated carbon + UV sterilization) eliminates odors/bacteria, meeting strict urban environmental standards.

System Configuration

  • Main Structure: 16Mn high-strength steel frame (14-16mm thickness) with four-cylinder synchronous compression + six reinforced guide columns for 24/7 heavy-load stability.
  • Hydraulic System: Energy-saving variable-frequency oil pump, corrosion-resistant alloy cylinders, and precision pressure-regulating valves—optimized for continuous high-pressure operation.
  • Control System: AI-assisted PLC with real-time data analytics, predictive fault diagnosis, and centralized management; supports remote parameter adjustment and energy optimization.
  • Environmental Systems: Integrated sewage treatment, triple deodorization, and noise reduction (≤71dB), compliant with global top-tier environmental standards.
  • Safety Systems: Multi-layer interlock protection, gas detection (methane/ammonia), fire alarms, and anti-overload/anti-fall devices—meeting ISO 14121 and OSHA standards.

Ideal Applications


Megacities/urban agglomerations, intercity waste transfer hubs, large industrial/logistics parks, waste-to-energy plant pre-processing facilities, and key Belt and Road smart city sanitation projects.

Why Choose This Model?


Leveraging economies of scale, it delivers unmatched cost efficiency with 24/7 continuous operation (via alternating bins), low unit energy consumption, and extended maintenance intervals. Compliant with global environmental and safety standards, it’s the top choice for large government tenders, cross-city PPPs, and waste-to-energy supporting facilities—offering reliable high throughput, tangible cost savings, and sustainable value for megacity sanitation management.

Product Specification

Parameter Details (120-200 TPD Sub-Model) Details (200-300 TPD Sub-Model)
Daily Processing Capacity 120-200 tons/day (3-shift operation) 200-300 tons/day (24/7 continuous operation)
Floor Space 18-20㎡ (space-efficient for large-scale demand) 20-22㎡ (reinforced structure for ultra-high load)
Compression Ratio 3.8:1 3.9:1 (top-tier in heavy-duty compactors)
Waste Density 1.0t/m³ 1.02t/m³
Automation Level AI-enhanced PLC + cloud IoT monitoring (75% manual labor reduction) Full intelligent automation + multi-station centralized control (80% manual labor reduction)
Energy Consumption ≤18kW/h per compaction cycle ≤22kW/h per compaction cycle (lower unit energy consumption: 0.07-0.08kW/h per ton)
Transportation Cost Saving 68% (vs. non-compacted waste transport) 70% (vs. non-compacted waste transport)
ROI Period 4-5 years 4.5-6 years
Noise Level ≤70dB ≤71dB
Frame Material 16Mn high-strength steel (14mm thickness, anti-deformation) 16Mn high-strength steel (16mm thickness + reinforced ribs)
Hydraulic System Pressure 32MPa 35MPa (high-pressure stable compression)
Storage Bin Configuration Dual alternating bins (12-14m³ each) Triple alternating bins (14-16m³ each)
Maintenance Interval 8 months 8 months (with predictive maintenance alerts)
Environmental Compliance EU ECOLABEL, GB/T 38592-2020, US EPA standards EU ECOLABEL, GB/T 38592-2020, US EPA, and ISO 14001



Product Overview

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 0
VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 1
VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 2



VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 3

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 4

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 5


VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 6

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 7

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 8

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 9

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 10

VerticaL 120-300T Hydraulic  Marine Solid   Refuse Trash Waste Refuse Garbage Compactor Plant 11